Introduction
Mobile crushers, also known as mobile crushing plants, represent a cornerstone of modern material processing in industries such as mining, quarrying, and construction and demolition (C&D) recycling. Their primary advantage lies in their mobility and self-propelled capability, allowing them to be transported directly to the material source, thereby drastically reducing hauling costs and increasing operational flexibility. However, the very nature of their work—processing large, hard materials with powerful machinery—introduces significant risks. A rigorous, systematic operating procedure is not merely a recommendation but an absolute necessity to ensure personnel safety, protect the equipment from damage, and achieve optimal production efficiency. This article provides a comprehensive overview of the standard operating procedures (SOPs) for a mobile crusher, segmented into pre-operational checks, startup and operation, shutdown, and post-operation maintenance.
This phase is the most critical for preventing accidents and equipment failure. It should be conducted meticulously at the beginning of every shift.
1.1. Personal Protective Equipment (PPE) and Site Awareness
1.2. Visual Inspection of the Crusher Unit
A thorough visual inspection must be performed with the machine completely powered down and immobilized (parking brake engaged).
1.3. Safety Systems Check
Verify that all integrated safety systems are fully functional:
After successful completion of pre-operational checks proceed with a structured startup sequence
1 Positioning Setup Move the crusher to its predetermined location ensuring it is level stable Extend outriggers or stabilizers if equipped according to manufacturer instructions to create a solid base
2 Clearance Check Perform a final audible visual confirmation that no personnel are inside exclusion zones especially near feed points discharge conveyors moving components Shout a clear warning e g “Starting up!”
3 Engine Start Start the power unit diesel engine Allow it to run at idle for several minutes to warm up fluids particularly in cold weather
4 System Activation From the local or remote control panel activate individual systems sequentially typically starting with discharge conveyors followed by screening units if applicable then finally the main crushing unit itself This “start from the discharge end” sequence prevents material blockages downstream
5 Run Empty Allow entire crushing circuit run without material feed for least 2-5 minutes This allows operator verify that
Once system running smoothly normal operation can begin
3 1 Feeding Material
3 2 Continuous Monitoring
Operator attention paramount during operation Constant monitoring required for
Proper shutdown essential safety longevity equipment Follow reverse sequence startup
1 Cease Feeding Completely stop flow material into crusher first
2 Empty Chamber Circuit Allow crusher continue running until all residual material processed cleared from crushing chamber conveyors An empty shutdown prevents material hardening setting inside machine during downtime making restart extremely difficult damaging
3 .Sequential Shutdown: Once system empty begin shutting down components reverse order startup i e main crusher first then screens then conveyors This ensures no residual material left stranded on stopped belts
4 .Idle Engine: Let engine idle few minutes cool down turbocharger other components especially after prolonged heavy operation
5 .Secure Machine: Turn off engine engage parking brake apply wheel chocks if necessary Perform quick visual walk-around note any issues need addressing next shift
While major maintenance scheduled separately shift-based tasks crucial 
Daily walk-around inspection should repeated note any new leaks unusual wear loose bolts
Refueling should conducted end shift not beginning This prevents cold fuel entering warm tank which can cause condensation internal tank moisture contamination Always refuel safe designated area away ignition sources
Greasing bearings lubrication points per manufacturer schedule must done while machinery stationary under LOTO
Record keeping logbook essential Note operating hours fuel consumption production tons any faults incidents repairs performed
Conclusion
Operating mobile crusher complex task demands high degree technical knowledge situational awareness unwavering commitment safety The procedures outlined above—pre-operation inspection methodical startup vigilant operation orderly shutdown—form foundation successful secure productive crushing operation Adherence these protocols not only protects workforce environment but also maximizes equipment availability return investment ensuring mobile crusher remains reliable asset years come